The air separation equipment is an important facility used for separating different gas components in the air, and it is widely applied in various industries such as steel, chemical, and energy. The installation process of this equipment is crucial as it directly affects the service life and operational efficiency of the equipment. This article will provide a detailed introduction to the installation steps of air separation equipment, from the basic construction to the system commissioning, ensuring that each step complies with the standard requirements and providing customers with efficient and safe operation guarantees.
1. Foundation construction and equipment positioning
The installation of air separation equipment requires foundation construction first. Foundation construction includes site survey and foundation pouring. Before positioning the equipment, it is necessary to ensure that the strength and levelness of the foundation meet the standards to avoid uneven settlement of the equipment due to unstable foundation. Foundation construction also needs to meet special requirements such as earthquake resistance and moisture-proofing to ensure the stability of the equipment during long-term operation. Equipment positioning requires the use of high-precision measuring instruments to ensure the precise arrangement of the equipment in space. This step is crucial for the smooth development of subsequent installation work.
2. Equipment hoisting and installation
Air separation equipment is large in volume and weight, so it requires professional hoisting equipment for equipment hoisting and installation. During hoisting, corresponding safety protection measures must be taken to avoid damage to the equipment and injuries to personnel. After the equipment is hoisted in place, each equipment component must be precisely installed and tightened to ensure that the equipment does not loosen or shift during operation. In addition, key components need to be inspected and adjusted during the installation process to ensure that every detail meets the design standards and installation specifications.
Post time: Jun-30-2025